2014 MOX project fast facts

For 2016 Mox Project Fast Facts click here

April 2014

Shaw AREVA MOX Services, LLC, comprised of Shaw Project Services Group and AREVA, has a contract with the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) to design, build and operate a facility to convert surplus nuclear weapon-grade plutonium into reactor fuel for use in commercial nuclear power plants.

This work supports NNSA’s nuclear nonproliferation program to eliminate nuclear weapon-grade plutonium in the U.S. Under a 2000 agreement, the United States and Russia will dispose of 68 metric tons of surplus plutonium, sufficient for approximately 17,000 nuclear weapons.

The MOX facility will process U.S. plutonium and a Russian facility will process Russian plutonium.

• First-of-its-kind facility in the U.S.
• First major nuclear construction project authorized by NRC in over 20 years
• Will produce fuel for use in commercial nuclear power reactors
• One MOX fuel assembly can provide enough electricity to power 9,000 homes for one year
• Project has worked 18 million safe work hours without a lost time incident
• OSHA Voluntary Protection Program (VPP) Star Site Certified
• Completed Facility Roof in early 2013
• 2010, 2011 and 2012 NRC Summary Reports found no areas needing improvement
• Mixed Oxide Fuel Fabrication Facility (MFFF) Operational Facts
     o Mixed Oxide (MOX) fuel contains a mixture of approximately 95% uranium oxide and 5% plutonium oxide
     o Capable of disposing 3.5 metric tons of plutonium annually
     o Designed to produce both Pressure Water Reactor (PWR) and Boiling Water Reactor (BWR) fuel assemblies
     o Output of 150 PWR fuel assemblies/year
     o Typical PWR fuel assembly contains 264 fuel rods and weighs about 1,500 pounds
     o 330 pellets per fuel rod
     o Facility will be capable of producing 70,000 pellets/day

• MFFF Construction Statistics (at completion)
     Concrete: 170,000 cubic yards
     Reinforcing Steel: 35,000 tons
     Process Piping: 85 miles
     HVAC duct work: 1,000 tons
     Conduit: 500,000 linear feet
     Cable Tray: 47,000 linear feet
     Power/Control Cable: 3,600,000 linear feet
     Process Systems: 300
     MFFF and Support Facilities Size: 600,000 square feet

Source:  Shaw AREVA MOX Services, LLC website – www.moxproject.com